Foundation Systems

Saver MicroPile System - Installation


Saver MicroPile Setting Machine (MAP)

See the video!




The pile drives directly and without a pilot hole by hammering individual 1 meter long units into the ground until the predetermined or required load is achieved. A test in tension is carried out on each pile assembly to verify the actual load carrying capacity.

If the required figure is not achieved further pile units are hammered into the ground and the control test repeated.

Each of the 1 meter pile sections has a connecting stud made of anodised high tensile aluminium. Therefore, any length of pile is possible depending upon local conditions.



 

Bobcat Mt52 -
Where there is no problem of access




Electric, Compressed Air or
Hydraulic hammer
22, 27, 44 or 66 kg




For use of a heavier
hammer (44 or 66 kg)
a lightweight rig is available to assist the installation of
Saver MicroPile




Manual Test Unit